This site in Wiltshire was undergoing a complete refurbishment programme as it was the 200th BP/M&S combined site in the UK. We were were asked to construct a new storage/walk in chiller extension to the back of the shop at this prestigious location. We supplied, delivered and installed a structural steel frame with a 120mm thick composite panel roof, high line gutter to the rear elevation including downpipes, building abutment flashing together with upstand and barge flashings to the ends of the building. To the rear elevation and side walls 100mm thick ISOclad panels with appropriate purlins and flashings were installed.
The story of this landmark BP M&S site appeared in the April 2015 edition of Forecourt Trader: